General |
Manufacture
Build |
Install
Certify |
|
Capabilities |
Dual Beta Sensor Design
Built-In Redundancy
Dry Basis Measurement
Wet Basis Measurement |
Process Rate Measurement
Isokinetic Flow Sampling
150 ft. Remote Sampling |
|
Calibrations |
Seven Point Beta Calibration
Four Point Flow Calibration
Automatic Daily Beta Calibration |
Automatic Daily Flow Calibration
Quarterly Beta Audit
Quarterly Flow Audit |
|
Features |
Heated Dilution Air
Simplified Filter Tape Replacement
Complete Alarms |
Complete Diagnostics
Built In Lightning Surge Protection
Manufactured in the U.S.A |
|
Enclosure |
Self-Contained
Environmentally Controlled |
Heating
Air Conditioned |
|
Construction |
NEMA 4X |
Control |
Programmable Logic Controller (PLC) |
Operation |
115 VAC |
Size |
14″ deep x 30″ wide x 72″ high
Enclosures
Single 56″ x 56″
Double 56″ x 112″ |
Regulations |
EPA
PS11 Federal Certification |
State Requirements |
|
Certifications |
Method 5 and 5B
MATS Method 5 |
Method 17 |
|
Options |
Remote Display and I/O to 1000 ft.
Outdoor Walk-In Enclosure |
MODBUS |
|
Applications |
Wet Stacks / Ducts
Coal Fired Power Plants
Cement Kilns
Petroleum Refineries |
Hazardous Waste Incinerators
Boiler Industrial Furnaces
Municipal Waste Combustors |
|
Measurements Not Affected By |
Stack Size
Changes in Particle Properties
- Size
- Shape
- Color
- Chemical Composition
- Density
Wet Stack Environment
- Scrubber
- Condensing ESP
- Quench Tower
|
Changes in Stack Gas
- Velocity
- Water Vapor (Humidity)
- Pressure
- Temperature
Equipment Variations
- Ball Mill / Pulverizer Wear
- ESP Degradation
- Fabric Filter Failure
- SO3 Injection
- Activated Carbon Injection
- Dry Sorbent Injection
|
|
Typical Lead Time |
10 to 20 weeks
Rush Services Available |